Construction Machines (Concrete Pumps)

 

 

 

 

 

 

OBJECT : Concrete pipes ( 6 meter pieces ) with hard concrete after approx 12 hours drying time.

 

TOOL : Rotating nozzle

 

FLOW : 17 lpm / 4.5 US gpm Approx.

 

PRESSURE : 350 kg/cm2 /343 bar / 5000 psi Approx.

 

MOTOR : 15 hp

 

TEMPERATURE : 20o C / 68o F

 

Click to make an enquiry

 
 
copyright © 2008 | All Rights reserved | Pressurejet